What Contractors Need From You to Start Insurance Restoration Fast

1. Your insurance claim number and adjuster's contact information

Every restoration project begins with a three-way conversation between you, your contractor, and your insurer. The claim number is the key to all of it. Without it, the contractor can't verify coverage, submit supplements, or coordinate the adjuster re-inspection that most claims require. Have the claim number, your adjuster's direct phone number and email, and your insurance company's claims department number written down and ready to hand over at the first meeting.

5 minutes to compile

Pro tip: Save your adjuster's contact as a phone entry — you'll call them multiple times during the process. A direct line avoids the 30-minute hold queue on the general claims number.

2. The adjuster's damage report and scope of loss

The adjuster's report lists every damaged item the insurer agreed to pay for, with quantities and unit prices. Your contractor needs this document to compare the approved scope against the actual damage they see on-site. Discrepancies between what the adjuster approved and what the contractor finds are the number-one cause of restoration delays — they trigger supplement negotiations that can add weeks. Providing this report upfront lets the contractor identify gaps immediately and file supplements before work begins, not midway through.

10 minutes to locate and share

Pro tip: Ask your insurer for the Xactimate file, not just a summary letter. Xactimate is the estimating software most insurers use — contractors who receive the actual file can compare line by line against their own estimate in minutes.

3. A copy of your insurance policy declarations page

The declarations page shows your coverage limits, deductible amount, and any endorsements or exclusions that affect the restoration. Contractors who do insurance work regularly can read a dec page in 30 seconds and tell you whether the project will be fully covered, partially covered, or likely to exceed your limits. This prevents surprises at the end when the final invoice arrives and your coverage caps out.

5 minutes to find in your policy packet or insurance app

Pro tip: Look specifically for 'ordinance or law' coverage and 'extended replacement cost' — these two endorsements often cover the code-upgrade costs and material price increases that basic policies exclude.

4. Access to the damaged property — including locked areas, attics, and crawl spaces

Contractors can't start work they can't reach. Restoration typically requires access to attics, crawl spaces, behind walls, garages, and sometimes utility rooms that are locked or gated. Before the contractor arrives, unlock all areas, move stored items away from walls in affected rooms, clear a path to the attic hatch, and make sure pets are secured. A contractor who shows up and can't access the damage wastes a trip — and pushes your project back 3–7 days on their schedule.

30–60 minutes to prepare access

Pro tip: If you're not going to be home, arrange key access or a lockbox code in advance. Restoration crews often need to return for multi-day work — having standing access avoids scheduling bottlenecks.

5. Your documentation: photos, videos, and a timeline of events

The photos and videos you took during or after the damage event are valuable to the contractor in two ways. First, they show the original severity of damage that may have dried or been cleaned up by the time the contractor arrives. Second, they support supplement requests to the insurer — if the contractor finds hidden damage consistent with your photos of active water intrusion, the supplement is much stronger. Share your full photo set, your timestamped notes, and any weather screenshots you saved.

10 minutes to share via email or AirDrop

Pro tip: Create a shared photo album or cloud folder — the contractor, your adjuster, and you can all access and add to it throughout the project. This eliminates the 'I never received that photo' delays.

6. Any previous repair records for the damaged area

If the damaged section of your home was repaired, renovated, or reroofed in the past, those records matter. Prior work history tells the contractor what's behind the walls (upgraded wiring? spray foam? previous water damage patches?) and helps them price the job accurately. It also helps your insurance claim — a 5-year-old roof replacement receipt proves the damage is from the current event, not pre-existing deterioration.

15–30 minutes to locate records

Pro tip: Don't have records? Check your email for old contractor invoices, search your bank statements for large home-repair payments, or ask your real estate agent for the seller's disclosure — it often lists major repairs done before the sale.

7. A clear decision on your deductible — and confirm you'll pay it

Your insurance deductible is your share of the cost — typically $1,000–$2,500 for homeowner policies and 1–2% of home value for hurricane or wind deductibles. The contractor needs to know the deductible amount because it affects the payment structure. Legitimate contractors will not offer to 'cover' or 'waive' your deductible — that's insurance fraud and puts your entire claim at risk. Be prepared to pay it directly to the contractor at signing or at project completion.

5 minutes to check your policy

Pro tip: If a contractor offers to waive your deductible, walk away. This is a red flag for inflated claims — if the insurer discovers it, your claim can be denied entirely and you may face policy cancellation.

8. Written authorization to begin work — but read the contract first

Contractors need a signed work authorization before they can order materials, schedule crews, or bill your insurance company. Read the contract carefully before signing. It should list the scope of work, the payment terms (usually paid by insurance proceeds plus your deductible), a start date, and an estimated completion timeline. Avoid contracts that include an Assignment of Benefits (AOB) unless you fully understand what you're signing — an AOB transfers your claim rights to the contractor, which can complicate disputes.

30 minutes to review and sign

Pro tip: A good restoration contract references the insurance claim number and states that the total cost will not exceed the insurance-approved amount plus your deductible, unless you agree in writing to any overages. This protects you from surprise bills.

Bonus Tip

Designate one point of contact in your household

Insurance restoration involves dozens of calls and decisions over weeks or months. If two homeowners are giving the contractor different instructions, or the insurer is calling one person while the contractor calls another, information falls through the cracks. Pick one person to handle all contractor and insurer communication. This single change can cut a 6-week project down to 4.

What to Avoid

  • Hiring a contractor who pressures you to sign before the adjuster has inspected — legitimate restoration contractors understand the insurance timeline.
  • Paying a large upfront deposit to a contractor you haven't vetted — standard insurance restoration contracts don't require more than the deductible upfront.
  • Giving verbal approval for work beyond the original scope without a written change order — unapproved extras won't be covered by your insurance.
  • Assuming the contractor will handle all insurance communication — stay involved, review every document the insurer sends, and don't delegate your claim entirely.